Developing Workplaces Built for Success.
Follow Us:
This facility is a 30’ clear 410,000 SF of distribution center attached by a 100’ connector to a 378,000 SF 24’ clear razor blade packaging plant
Located 7 miles from route 495 on route 2 for easy access to northern New England
This facility includes two buildings totaling 788,000 SF
This flat site was planned to maximize Gillette’s needs for product flow
Campanelli met the needs of a Fortune 500 Company by taking advantage of government incentives through the BRAC process